1968Highway Research RecordRequires access

THE CHANNEL TUNNEL: 1751-1975

Frank P. Davidson

Open publisher page 0 citations

Abstract

THE HISTORY IS REVIEWED ON RESEARCH AND PREPARATION OF THE CHANNEL TUNNEL. A DESCRIPTION IS GIVEN OF STUDIES CARRIED OUT IN RECENT YEARS, CONCLUDING WITH SOME COMMENTS ON THE IMPLICATIONS, FOR THE ENGINEERING PROFESSION, OF THE FINANCING BY PRIVATE MEANS OF A PROJECT WHICH HAD BEEN THOUGHT TO BE OF SUCH MAGNITUDE THAT IT HAD TO BE ACCOMPLISHED ON A GOVERNMENTAL BASIS. VALID ROUTES HAVE BEEN DELINEATED FOR EITHER A BORED TUNNEL THAT WOULD BE EMBEDDED IN THE LOWER CHALK, OR AN IMMERSED TUBE LAID IN A TRENCH DREDGED IN THE SEA BED. THE DECISION AS TO THE TYPE OF CONSTRUCTION MAY DEPEND UPON THE TERMS AND CONDITIONS SUBMITTED BY CONTRACTORS. TWENTY-FOUR HOUR SERVICE WILL BE AVAILABLE, WITH TRAINS DEPARTING EVERY FIVE OR TEN MINUTES DURING PEAK PERIODS. COSTS OF THE TUNNEL ARE REVIEWED.

About this research paper

What this paper is about

THE HISTORY IS REVIEWED ON RESEARCH AND PREPARATION OF THE CHANNEL TUNNEL. A DESCRIPTION IS GIVEN OF STUDIES CARRIED OUT IN RECENT YEARS, CONCLUDING WITH SOME COMMENTS ON THE IMPLICATIONS, FOR THE ENGINEERING PROFESSION, OF THE FINANCING BY PRIVATE MEANS OF A PROJECT WHICH HAD BEEN THOUGHT TO BE OF SUCH MAGNITUDE THAT IT HAD TO BE ACCOMPLISHED ON A GOVERNMENTAL BASIS. VALID ROUTES HAVE BEEN DELINEATED FOR EITHER A BORED TUNNEL THAT WOULD BE EMBEDDED IN THE LOWER CHALK, OR AN IMMERSED TUBE LAID IN A TRENCH DREDGED IN THE SEA BED. THE DECISION AS TO THE TYPE OF CONSTRUCTION MAY DEPEND UPON THE TERMS AND CONDITIONS SUBMITTED BY CONTRACTORS. TWENTY-FOUR HOUR SERVICE WILL BE AVAILABLE, WITH TRAINS DEPARTING EVERY FIVE OR TEN MINUTES DURING PEAK PERIODS. COSTS OF THE TUNNEL ARE REVIEWED.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

THE HISTORY IS REVIEWED ON RESEARCH AND PREPARATION OF THE CHANNEL TUNNEL. A DESCRIPTION IS GIVEN OF STUDIES CARRIED OUT IN RECENT YEARS, CONCLUDING WITH SOME COMMENTS ON THE IMPLICATIONS, FOR THE ENGINEERING PROFESSION, OF THE FINANCING BY PRIVATE MEANS OF A PROJECT WHICH HAD BEEN THOUGHT TO BE OF SUCH MAGNITUDE THAT IT HAD TO BE ACCOMPLISHED ON A GOVERNMENTAL BASIS. VALID ROUTES HAVE BEEN DELINEATED FOR EITHER A BORED TUNNEL THAT WOULD BE EMBEDDED IN THE LOWER CHALK, OR AN IMMERSED TUBE LAID IN A TRENCH DREDGED IN THE SEA BED. THE DECISION AS TO THE TYPE OF CONSTRUCTION MAY DEPEND UPON THE TERMS AND CONDITIONS SUBMITTED BY CONTRACTORS. TWENTY-FOUR HOUR SERVICE WILL BE AVAILABLE, WITH TRAINS DEPARTING EVERY FIVE OR TEN MINUTES DURING PEAK PERIODS. COSTS OF THE TUNNEL ARE REVIEWED.

Key concepts: Channel tunnel, Trench, Channel (broadcasting), Train, Immersed tube, Engineering, Civil engineering, Service (business)

Related papers

Back to paper searchBrowse research topicsOriginal source
THE CHANNEL TUNNEL: 1751-1975 — Research Paper | ScholarLens