CONSTRUCTION PLAN OF A DIVERSION TUNNEL TO BE CONSTRUCTED BENEATH AND CROSSING THE RAILWAY TUNNEL

Hidenori Yoshida

Open publisher page 0 citations

Abstract

A diversion tunnel will be constructed which crosses the existing railway tunnel at a depth of 2.0 m right under the latter tunnel. It is feared that when the diversion tunnel to be constructed near the existing railway tunnel may exercise adverse effects such as deformation and disturbance on the railway tunnel. Further, it has become a first priority to ensure safe operation of trains, and in addition, assurance of long-term safety of train operation is demanded. Since the example of the above-mentioned construction work is very rare, sufficient but not-excessive examinations have been made on the survey, analyses, designs and construction plans. The results are shown in this paper. For the covering abstract see ITRD E108195.

About this research paper

What this paper is about

A diversion tunnel will be constructed which crosses the existing railway tunnel at a depth of 2.0 m right under the latter tunnel. It is feared that when the diversion tunnel to be constructed near the existing railway tunnel may exercise adverse effects such as deformation and disturbance on the railway tunnel. Further, it has become a first priority to ensure safe operation of trains, and in addition, assurance of long-term safety of train operation is demanded. Since the example of the above-mentioned construction work is very rare, sufficient but not-excessive examinations have been made on the survey, analyses, designs and construction plans. The results are shown in this paper. For the covering abstract see ITRD E108195.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A diversion tunnel will be constructed which crosses the existing railway tunnel at a depth of 2.0 m right under the latter tunnel. It is feared that when the diversion tunnel to be constructed near the existing railway tunnel may exercise adverse effects such as deformation and disturbance on the railway tunnel. Further, it has become a first priority to ensure safe operation of trains, and in addition, assurance of long-term safety of train operation is demanded. Since the example of the above-mentioned construction work is very rare, sufficient but not-excessive examinations have been made on the survey, analyses, designs and construction plans. The results are shown in this paper. For the covering abstract see ITRD E108195.

Key concepts: Train, Engineering, Plan (archaeology), Work (physics), Railway tunnel, Tunnel construction, Transport engineering, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
CONSTRUCTION PLAN OF A DIVERSION TUNNEL TO BE CONSTRUCTED BENEATH AND CROSSING THE RAILWAY TUNNEL — Research Paper | ScholarLens