THE MAKING OF THE CHANNEL TUNNEL
T Byrd
Abstract
T Byrd
Abstract
This special supplement to New Civil Engineer commemorates the opening of the English Channel Tunnel, charting each milestone from concept to commission. Numerous photographs and paintings capture the tunnel's construction, as the author provides valuable insights into the efforts of key people who financed, designed, and built it. Driving and surveying tunnel lengths, building the terminals, upgrading highway links, and equipping the transport system are among the unique physical difficulties and logistical problems covered.
OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This special supplement to New Civil Engineer commemorates the opening of the English Channel Tunnel, charting each milestone from concept to commission. Numerous photographs and paintings capture the tunnel's construction, as the author provides valuable insights into the efforts of key people who financed, designed, and built it. Driving and surveying tunnel lengths, building the terminals, upgrading highway links, and equipping the transport system are among the unique physical difficulties and logistical problems covered.
Key concepts: Channel tunnel, Milestone, Engineering, Channel (broadcasting), Commission, Key (lock), Construction engineering, Civil engineering