HEATHROW'S ART TAKES OFF

Tanya Ann Thomas

Open publisher page 0 citations

Abstract

The Airside Road Tunnel (ART) at Heathrow airport will provide all- weather ground vehicle access from the Central Terminal to western aircraft stands. Being done in the shadow of the 1994 tunnel collapse at the Heathrow express Tunnel (HEX) project, it is being carried out with extensive attention paid to safety. It is being constructed with a tunnel-boring machine starting eastbound. The tunnel will be 1.3 km long, 8.1 m. in diameter, and have 2 bores. Surface settlement on the active airport surface above will be limited to 30-40 mm, which will be monitored with extensive instrumentation. Completion of the tunnel is expected by February 2005.

About this research paper

What this paper is about

The Airside Road Tunnel (ART) at Heathrow airport will provide all- weather ground vehicle access from the Central Terminal to western aircraft stands. Being done in the shadow of the 1994 tunnel collapse at the Heathrow express Tunnel (HEX) project, it is being carried out with extensive attention paid to safety. It is being constructed with a tunnel-boring machine starting eastbound. The tunnel will be 1.3 km long, 8.1 m. in diameter, and have 2 bores. Surface settlement on the active airport surface above will be limited to 30-40 mm, which will be monitored with extensive instrumentation. Completion of the tunnel is expected by February 2005.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Airside Road Tunnel (ART) at Heathrow airport will provide all- weather ground vehicle access from the Central Terminal to western aircraft stands. Being done in the shadow of the 1994 tunnel collapse at the Heathrow express Tunnel (HEX) project, it is being carried out with extensive attention paid to safety. It is being constructed with a tunnel-boring machine starting eastbound. The tunnel will be 1.3 km long, 8.1 m. in diameter, and have 2 bores. Surface settlement on the active airport surface above will be limited to 30-40 mm, which will be monitored with extensive instrumentation. Completion of the tunnel is expected by February 2005.

Key concepts: Shadow (psychology), Settlement (finance), Engineering, Instrumentation (computer programming), Civil engineering, Forensic engineering, Computer science, World Wide Web

Related papers

Back to paper searchBrowse research topicsOriginal source
HEATHROW'S ART TAKES OFF — Research Paper | ScholarLens