This article describes the four bored tunnels that comprise the Terminal 5 (T5) project at Heathrow airport. The 4.1 km long Storm Water Outfall Tunnel (SWOT) is intended to take the increased surface water runoff from the new Terminal 5 and its paved areas to an area 2 km south of the airport. A service tunnel under the A3044 roadway. which provides access to the T5 site from the west for power and other services, involves twin 140 m long tunnels constructed by pipe jack. The Heathrow Express Extension (HExEx) will be a twin bore 3.2 km long tunnel that will connect the existing Heathrow Express line to a new station that will be a part of the main T5 Terminal. Finally, the Piccadilly Extension (PiccEx), a twin bore 1.7 km long tunnel, will provide an extension from the existing Piccadilly London Underground line to a new underground station also at the T5 Terminal.

About this research paper

What this paper is about

This article describes the four bored tunnels that comprise the Terminal 5 (T5) project at Heathrow airport. The 4.1 km long Storm Water Outfall Tunnel (SWOT) is intended to take the increased surface water runoff from the new Terminal 5 and its paved areas to an area 2 km south of the airport. A service tunnel under the A3044 roadway. which provides access to the T5 site from the west for power and other services, involves twin 140 m long tunnels constructed by pipe jack. The Heathrow Express Extension (HExEx) will be a twin bore 3.2 km long tunnel that will connect the existing Heathrow Express line to a new station that will be a part of the main T5 Terminal. Finally, the Piccadilly Extension (PiccEx), a twin bore 1.7 km long tunnel, will provide an extension from the existing Piccadilly London Underground line to a new underground station also at the T5 Terminal.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article describes the four bored tunnels that comprise the Terminal 5 (T5) project at Heathrow airport. The 4.1 km long Storm Water Outfall Tunnel (SWOT) is intended to take the increased surface water runoff from the new Terminal 5 and its paved areas to an area 2 km south of the airport. A service tunnel under the A3044 roadway. which provides access to the T5 site from the west for power and other services, involves twin 140 m long tunnels constructed by pipe jack. The Heathrow Express Extension (HExEx) will be a twin bore 3.2 km long tunnel that will connect the existing Heathrow Express line to a new station that will be a part of the main T5 Terminal. Finally, the Piccadilly Extension (PiccEx), a twin bore 1.7 km long tunnel, will provide an extension from the existing Piccadilly London Underground line to a new underground station also at the T5 Terminal.

Key concepts: Terminal (telecommunication), Engineering, Outfall, Civil engineering, Railway tunnel, Telecommunications, Environmental engineering