2007New Civil EngineerRequires access

Heathrow's hidden gems

A Mylius

Open publisher page 0 citations

Abstract

The tunnelling associated with the construction of Heathrow Airport Terminal 5, UK includes two rail tunnels: the extension to London Underground's Piccadilly Line and BAA's Heathrow Express. The rail tunnels are due to carry their first passengers in March 2008. To reduce the risks associated with tunnelling, the same companies have been responsible for the construction of all tunnels. Signalling is the only activity carried out by different contractors. London Underground PPP contractor Tube Lines has carried out signalling on the Piccadilly Line extension and Westinghouse has installed signalling on the Heathrow Express extension. When the Heathrow Express was built, T5 was planned, and stub tunnels were constructed, enabling tunnel boring machines (TBMs) to drive straight off. To construct the new twin Piccadilly Line bores, Morgan Vinci had to construct a box from which to launch its TBMs. A new junction box had to be constructed to connect the new tunnels with the existing Piccadilly Line at Terminals 1, 2 and 3. A new form of New Austrian Tunnelling Method, known as Laser Shell, developed by Mott MacDonald and Morgan Vinci, was used for the cross passages and connections on the two rail extension projects.

About this research paper

What this paper is about

The tunnelling associated with the construction of Heathrow Airport Terminal 5, UK includes two rail tunnels: the extension to London Underground's Piccadilly Line and BAA's Heathrow Express. The rail tunnels are due to carry their first passengers in March 2008. To reduce the risks associated with tunnelling, the same companies have been responsible for the construction of all tunnels. Signalling is the only activity carried out by different contractors. London Underground PPP contractor Tube Lines has carried out signalling on the Piccadilly Line extension and Westinghouse has installed signalling on the Heathrow Express extension. When the Heathrow Express was built, T5 was planned, and stub tunnels were constructed, enabling tunnel boring machines (TBMs) to drive straight off. To construct the new twin Piccadilly Line bores, Morgan Vinci had to construct a box from which to launch its TBMs. A new junction box had to be constructed to connect the new tunnels with the existing Piccadilly Line at Terminals 1, 2 and 3. A new form of New Austrian Tunnelling Method, known as Laser Shell, developed by Mott MacDonald and Morgan Vinci, was used for the cross passages and connections on the two rail extension projects.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The tunnelling associated with the construction of Heathrow Airport Terminal 5, UK includes two rail tunnels: the extension to London Underground's Piccadilly Line and BAA's Heathrow Express. The rail tunnels are due to carry their first passengers in March 2008. To reduce the risks associated with tunnelling, the same companies have been responsible for the construction of all tunnels. Signalling is the only activity carried out by different contractors. London Underground PPP contractor Tube Lines has carried out signalling on the Piccadilly Line extension and Westinghouse has installed signalling on the Heathrow Express extension. When the Heathrow Express was built, T5 was planned, and stub tunnels were constructed, enabling tunnel boring machines (TBMs) to drive straight off. To construct the new twin Piccadilly Line bores, Morgan Vinci had to construct a box from which to launch its TBMs. A new junction box had to be constructed to connect the new tunnels with the existing Piccadilly Line at Terminals 1, 2 and 3. A new form of New Austrian Tunnelling Method, known as Laser Shell, developed by Mott MacDonald and Morgan Vinci, was used for the cross passages and connections on the two rail extension projects.

Key concepts: Engineering, New Austrian Tunnelling method, Railway line, Line (geometry), Railway tunnel, Quantum tunnelling, Construct (python library), Telecommunications