Influence of regulation of cascade hydropower reservoirs on diversion and closure in construction

Cai Jian-guo

Open publisher page 0 citations

Abstract

Cascade hydropower stations are connected in the basin and adjacent in space. The influence of the upstream projects under construction or completed on diversion and closure are reflected by the variation of flood characteristics during construction. As construction of cascade hydroelectric stations changes the original flood drainage channel and flood control as well as dynamic characteristics of construction diversion are different from construction case of single power station, flood has multiple attributes and uncertainty in time and space. In this article, main factors and contents are inducted and summarized about the diversion design, taking consideration of the regulation effect of upstream and downstream cascade reservoirs. Some main principles and matters need attention about diversion standards with the regulation effect of cascade hydropower stations are put forward.

About this research paper

What this paper is about

Cascade hydropower stations are connected in the basin and adjacent in space. The influence of the upstream projects under construction or completed on diversion and closure are reflected by the variation of flood characteristics during construction. As construction of cascade hydroelectric stations changes the original flood drainage channel and flood control as well as dynamic characteristics of construction diversion are different from construction case of single power station, flood has multiple attributes and uncertainty in time and space. In this article, main factors and contents are inducted and summarized about the diversion design, taking consideration of the regulation effect of upstream and downstream cascade reservoirs. Some main principles and matters need attention about diversion standards with the regulation effect of cascade hydropower stations are put forward.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Cascade hydropower stations are connected in the basin and adjacent in space. The influence of the upstream projects under construction or completed on diversion and closure are reflected by the variation of flood characteristics during construction. As construction of cascade hydroelectric stations changes the original flood drainage channel and flood control as well as dynamic characteristics of construction diversion are different from construction case of single power station, flood has multiple attributes and uncertainty in time and space. In this article, main factors and contents are inducted and summarized about the diversion design, taking consideration of the regulation effect of upstream and downstream cascade reservoirs. Some main principles and matters need attention about diversion standards with the regulation effect of cascade hydropower stations are put forward.

Key concepts: Hydropower, Cascade, Upstream (networking), Flood control, Hydroelectricity, Flood myth, Closure (psychology), Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Influence of regulation of cascade hydropower reservoirs on diversion and closure in construction — Research Paper | ScholarLens