2013Journal of Hydroelectric EngineeringRequires access

Risk decision of construction diversion schemes under condition of pre-discharge at cascade hydropower stations

Xue Jin-pin

Open publisher page 0 citations

Abstract

In construction of cascade hydropower stations,through pre-discharge at the upstream stations that cuts flood peak and floodwater storage,the construction flood of the downstream station to build will also be reduced and the flood control condition and other characters of the construction diversion system are changed.In light of such a situation,this paper systematically examines the causes of construction diversion risk and its coupling relation and develops a measure model of diversion risk based on simulation technology.We studied the benefit transfer between upstream station and downstream diversion project,put forward a strategy for calculating the coordinated distribution of diversion system gain and loss,and developed a model for optimization of construction diversion schemes using the coordinated distribution of gain and loss.In this model,double goal optimization is singled by a utility function and system benefit utility is used as a comprehensive index to measure the quality of diversion schemes.An example is presented to verify the presented approach.This study is useful for selecting a diversion scheme in cascade hydropower development.

About this research paper

What this paper is about

In construction of cascade hydropower stations,through pre-discharge at the upstream stations that cuts flood peak and floodwater storage,the construction flood of the downstream station to build will also be reduced and the flood control condition and other characters of the construction diversion system are changed.In light of such a situation,this paper systematically examines the causes of construction diversion risk and its coupling relation and develops a measure model of diversion risk based on simulation technology.We studied the benefit transfer between upstream station and downstream diversion project,put forward a strategy for calculating the coordinated distribution of diversion system gain and loss,and developed a model for optimization of construction diversion schemes using the coordinated distribution of gain and loss.In this model,double goal optimization is singled by a utility function and system benefit utility is used as a comprehensive index to measure the quality of diversion schemes.An example is presented to verify the presented approach.This study is useful for selecting a diversion scheme in cascade hydropower development.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In construction of cascade hydropower stations,through pre-discharge at the upstream stations that cuts flood peak and floodwater storage,the construction flood of the downstream station to build will also be reduced and the flood control condition and other characters of the construction diversion system are changed.In light of such a situation,this paper systematically examines the causes of construction diversion risk and its coupling relation and develops a measure model of diversion risk based on simulation technology.We studied the benefit transfer between upstream station and downstream diversion project,put forward a strategy for calculating the coordinated distribution of diversion system gain and loss,and developed a model for optimization of construction diversion schemes using the coordinated distribution of gain and loss.In this model,double goal optimization is singled by a utility function and system benefit utility is used as a comprehensive index to measure the quality of diversion schemes.An example is presented to verify the presented approach.This study is useful for selecting a diversion scheme in cascade hydropower development.

Key concepts: Hydropower, Cascade, Upstream (networking), Downstream (manufacturing), Flood control, Civil engineering, Environmental science, Flood myth

Related papers

Back to paper searchBrowse research topicsOriginal source
Risk decision of construction diversion schemes under condition of pre-discharge at cascade hydropower stations — Research Paper | ScholarLens