Discussion on construction diversion design standard and discharge in cascade hydropower projects
Cheng Ya
Abstract
Cheng Ya
Abstract
Through the analysis of construction diversion design and implement for constructed cascade hydraulic and hydropower projects in China, the paper discusses the determination method of construction diversion standard and discharge of downstream hydraulic and hydropower project under the condition of upstream reservoir in operation. [
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Through the analysis of construction diversion design and implement for constructed cascade hydraulic and hydropower projects in China, the paper discusses the determination method of construction diversion standard and discharge of downstream hydraulic and hydropower project under the condition of upstream reservoir in operation. [
Key concepts: Hydropower, Cascade, Water diversion, Upstream (networking), Downstream (manufacturing), Hydro power, Engineering, Civil engineering