Problems and Their Solutions of Positioning Construction of Spatial Cable System of Fumin Bridge in Tianjin
Wei Zhuangke, Ovm Machinery
Abstract
Wei Zhuangke, Ovm Machinery
Abstract
The main bridge of Fumin Bridge in Tianjin is a single tower and spatial cable plane self-anchored suspension bridge.In the construction of the spatial cable system of the bridge,quite a few technical problems caused by the unique structure of the bridge occurred.Through careful study and analysis of the problems occurring in course of the construction,the problems were properly solved and the positioning construction of the cable system was finally smoothly accomplished.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The main bridge of Fumin Bridge in Tianjin is a single tower and spatial cable plane self-anchored suspension bridge.In the construction of the spatial cable system of the bridge,quite a few technical problems caused by the unique structure of the bridge occurred.Through careful study and analysis of the problems occurring in course of the construction,the problems were properly solved and the positioning construction of the cable system was finally smoothly accomplished.
Key concepts: Bridge (graph theory), Tower, Engineering, Structural engineering, Suspension (topology), Plane (geometry), Civil engineering, Geometry