Quality control of right bank arch dam abutment excavation of Dagangshan Hydropower Station

Li Zhou

Open publisher page 1 citations

Abstract

Dagangshan Hydropower Station is a double-curvature dam that requires a high excavation quality on abutment.The replacement excavation is needed for partial foundation cushion of the abutment and the foundation surface are in 5 polyline type,causing difficulties of pre-splitting construction.Through comparison and selection,the construction scheme of excavation by bench blasting from top to bottom,ballast collecting by bulldozer and dumping into foundation pit by backhoe was adopted.The quality key points including over excavation and under excavation,flatness,residual pore ratio,particle vibration velocity were controlled strictly through emphasizing the process control,and the excavation quality reached an excellent level.

About this research paper

What this paper is about

Dagangshan Hydropower Station is a double-curvature dam that requires a high excavation quality on abutment.The replacement excavation is needed for partial foundation cushion of the abutment and the foundation surface are in 5 polyline type,causing difficulties of pre-splitting construction.Through comparison and selection,the construction scheme of excavation by bench blasting from top to bottom,ballast collecting by bulldozer and dumping into foundation pit by backhoe was adopted.The quality key points including over excavation and under excavation,flatness,residual pore ratio,particle vibration velocity were controlled strictly through emphasizing the process control,and the excavation quality reached an excellent level.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Dagangshan Hydropower Station is a double-curvature dam that requires a high excavation quality on abutment.The replacement excavation is needed for partial foundation cushion of the abutment and the foundation surface are in 5 polyline type,causing difficulties of pre-splitting construction.Through comparison and selection,the construction scheme of excavation by bench blasting from top to bottom,ballast collecting by bulldozer and dumping into foundation pit by backhoe was adopted.The quality key points including over excavation and under excavation,flatness,residual pore ratio,particle vibration velocity were controlled strictly through emphasizing the process control,and the excavation quality reached an excellent level.

Key concepts: Excavation, Abutment, Cushion, Geotechnical engineering, Engineering, Hydropower, Foundation (evidence), Arch dam