Excavation technology of abutment groove at left bank of Dagangshan Hydropower Station

Luo Feiyue

Open publisher page 0 citations

Abstract

The geological condition of Dagangshan Dam site is complicated with many faults and weak layers,which brought difficulties to the construction and threatened the dam safety.In the light of the characteristics of the strict requirement of the excavation size,the quality control of the foundation planes,blasting vibration control,acoustic wave attenuation,and large amount of drilling and blasting and difficult excavation of long and gentle slopes,the outside-in and top-down excavation was designed as the general scheme.The required construction tools were technically improved.The basic construction method and blasting tests were introduced.The summary of pre-splitting over-break balance construction method and drilling-blasting parameters shows that the construction efficiency and quality are greatly improved and the cost is reduced.

About this research paper

What this paper is about

The geological condition of Dagangshan Dam site is complicated with many faults and weak layers,which brought difficulties to the construction and threatened the dam safety.In the light of the characteristics of the strict requirement of the excavation size,the quality control of the foundation planes,blasting vibration control,acoustic wave attenuation,and large amount of drilling and blasting and difficult excavation of long and gentle slopes,the outside-in and top-down excavation was designed as the general scheme.The required construction tools were technically improved.The basic construction method and blasting tests were introduced.The summary of pre-splitting over-break balance construction method and drilling-blasting parameters shows that the construction efficiency and quality are greatly improved and the cost is reduced.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The geological condition of Dagangshan Dam site is complicated with many faults and weak layers,which brought difficulties to the construction and threatened the dam safety.In the light of the characteristics of the strict requirement of the excavation size,the quality control of the foundation planes,blasting vibration control,acoustic wave attenuation,and large amount of drilling and blasting and difficult excavation of long and gentle slopes,the outside-in and top-down excavation was designed as the general scheme.The required construction tools were technically improved.The basic construction method and blasting tests were introduced.The summary of pre-splitting over-break balance construction method and drilling-blasting parameters shows that the construction efficiency and quality are greatly improved and the cost is reduced.

Key concepts: Excavation, Drilling, Drilling and blasting, Foundation (evidence), Abutment, Hydropower, Engineering, Geotechnical engineering