2005Industrial Engineering and ManagementRequires access

Application of the Work Study to Balancing Production Lines

Guo Fu, Guomin Zhang

Open publisher page 1 citations

Abstract

Aiming at laser head base preparation (namely H-S preparation) production lines of an enterprise, this paper applies the nodular method and second watch measuring time method to measure the work time of various stations of production lines, and to find out both the bottle-neck stations and the superfluous capability stations effecting on the line production capability. Problems of equipment capability、manpower、task distribution、technology and production lines layout are revealed and analyzed by using the 5W1H check list. Basing on the principle of ECRS (Eliminate, Combine, Rearrange, Simple) and the line balancing theory, this paper provides the line balancing schema, including the improvement of the existing equipment, the reallocation of the work content for relative stations, the adjustment of the equipment and workers of some stations, the reduction of machine working time of some stations, the change of production line layout and the implementation of subsection management etc. After being put in practice, this project takes great benefit for the enterprise, for example, the production capability of production line improved up 61.4%, workers cut down 111, manpower cost saves $922400 every year, and workshop condition is also improved.

About this research paper

What this paper is about

Aiming at laser head base preparation (namely H-S preparation) production lines of an enterprise, this paper applies the nodular method and second watch measuring time method to measure the work time of various stations of production lines, and to find out both the bottle-neck stations and the superfluous capability stations effecting on the line production capability. Problems of equipment capability、manpower、task distribution、technology and production lines layout are revealed and analyzed by using the 5W1H check list. Basing on the principle of ECRS (Eliminate, Combine, Rearrange, Simple) and the line balancing theory, this paper provides the line balancing schema, including the improvement of the existing equipment, the reallocation of the work content for relative stations, the adjustment of the equipment and workers of some stations, the reduction of machine working time of some stations, the change of production line layout and the implementation of subsection management etc. After being put in practice, this project takes great benefit for the enterprise, for example, the production capability of production line improved up 61.4%, workers cut down 111, manpower cost saves $922400 every year, and workshop condition is also improved.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Aiming at laser head base preparation (namely H-S preparation) production lines of an enterprise, this paper applies the nodular method and second watch measuring time method to measure the work time of various stations of production lines, and to find out both the bottle-neck stations and the superfluous capability stations effecting on the line production capability. Problems of equipment capability、manpower、task distribution、technology and production lines layout are revealed and analyzed by using the 5W1H check list. Basing on the principle of ECRS (Eliminate, Combine, Rearrange, Simple) and the line balancing theory, this paper provides the line balancing schema, including the improvement of the existing equipment, the reallocation of the work content for relative stations, the adjustment of the equipment and workers of some stations, the reduction of machine working time of some stations, the change of production line layout and the implementation of subsection management etc. After being put in practice, this project takes great benefit for the enterprise, for example, the production capability of production line improved up 61.4%, workers cut down 111, manpower cost saves $922400 every year, and workshop condition is also improved.

Key concepts: Bottle neck, Production line, Production (economics), Schema (genetic algorithms), Computer science, Production manager, Work (physics), Assembly line

Related papers

Back to paper searchBrowse research topicsOriginal source
Application of the Work Study to Balancing Production Lines — Research Paper | ScholarLens