2018IOP Conference Series Materials Science and EngineeringOpen access

Analysis of productivity improvement using line balancing method (study case assembling line in PT XYZ)

R Iwan

Open full text 2 citations

Abstract

To produce optimal production, it is necessary to adjust the placement of labor quantity, work line arrangement, facility layout and machine position, but to get accurate results as the initial calculation before production, it is necessary to schedule the right target with correct calculation , so there is no mistake in production, based on the results of previous research, the cause of cessation of production due to no production support materials, traffic jam between work stations, delay of order, and delay of delivery of goods.One of the factors that is quite influential in productivity is the production line and how many work stations.The efficiency of the production line between several related work stations is very influential in supporting the continuity of the company's production.This paper aims to analyze the cause of the delay in Line assembling so that the flow of raw materials and intermediate goods between work stations is better by using line balancing method.Delay, shortage of workers and the effectiveness of materials can be overcome.Based on the problems found in the assembling development section, it is known that there is congestion in the production process can be seen in station F because the cycle time is 6 minutes so the station G must wait for 4 minutes after the work.After the improvement cycle time reduced to 1554 seconds from the previous 1580 seconds, efficiency from 93.38% to 98.87%, with the method of line balancing obtained increased productivity and production efficiency.

Open-access reader

About this research paper

What this paper is about

To produce optimal production, it is necessary to adjust the placement of labor quantity, work line arrangement, facility layout and machine position, but to get accurate results as the initial calculation before production, it is necessary to schedule the right target with correct calculation , so there is no mistake in production, based on the results of previous research, the cause of cessation of production due to no production support materials, traffic jam between work stations, delay of order, and delay of delivery of goods.One of the factors that is quite influential in productivity is the production line and how many work stations.The efficiency of the production line between several related work stations is very influential in supporting the continuity of the company's production.This paper aims to analyze the cause of the delay in Line assembling so that the flow of raw materials and intermediate goods between work stations is better by using line balancing method.Delay, shortage of workers and the effectiveness of materials can be overcome.Based on the problems found in the assembling development section, it is known that there is congestion in the production process can be seen in station F because the cycle time is 6 minutes so the station G must wait for 4 minutes after the work.After the improvement cycle time reduced to 1554 seconds from the previous 1580 seconds, efficiency from 93.38% to 98.87%, with the method of line balancing obtained increased productivity and production efficiency.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

To produce optimal production, it is necessary to adjust the placement of labor quantity, work line arrangement, facility layout and machine position, but to get accurate results as the initial calculation before production, it is necessary to schedule the right target with correct calculation , so there is no mistake in production, based on the results of previous research, the cause of cessation of production due to no production support materials, traffic jam between work stations, delay of order, and delay of delivery of goods.One of the factors that is quite influential in productivity is the production line and how many work stations.The efficiency of the production line between several related work stations is very influential in supporting the continuity of the company's production.This paper aims to analyze the cause of the delay in Line assembling so that the flow of raw materials and intermediate goods between work stations is better by using line balancing method.Delay, shortage of workers and the effectiveness of materials can be overcome.Based on the problems found in the assembling development section, it is known that there is congestion in the production process can be seen in station F because the cycle time is 6 minutes so the station G must wait for 4 minutes after the work.After the improvement cycle time reduced to 1554 seconds from the previous 1580 seconds, efficiency from 93.38% to 98.87%, with the method of line balancing obtained increased productivity and production efficiency.

Key concepts: Production line, Production (economics), Productivity, Work (physics), Computer science, Line (geometry), Schedule, Mistake

Related papers

Back to paper searchBrowse research topicsOriginal source
Analysis of productivity improvement using line balancing method (study case assembling line in PT XYZ) — Research Paper | ScholarLens