Technical Schemes for Metro Station Construction Based on Shield Method

He Chuan

Open publisher page 0 citations

Abstract

The construction methods of overseas metro stations driven with the shield method were introduced. Based on the fact that a single line shield tunnel has a diameter of about 6.0 m in China, four construction schemes of a metro station driven from a sectional shield tunnel with the expanding excavation were proposed. According to the main technical standards and construction dimensions of Linhexilu station in the Guangzhou No.3 metro line, the structures and construction schemes of this station were designed. Finally, the main related technical problems to be resolved were discussed, including construction steps, design method of station structure, design of special segment, environment control and project cost.

About this research paper

What this paper is about

The construction methods of overseas metro stations driven with the shield method were introduced. Based on the fact that a single line shield tunnel has a diameter of about 6.0 m in China, four construction schemes of a metro station driven from a sectional shield tunnel with the expanding excavation were proposed. According to the main technical standards and construction dimensions of Linhexilu station in the Guangzhou No.3 metro line, the structures and construction schemes of this station were designed. Finally, the main related technical problems to be resolved were discussed, including construction steps, design method of station structure, design of special segment, environment control and project cost.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The construction methods of overseas metro stations driven with the shield method were introduced. Based on the fact that a single line shield tunnel has a diameter of about 6.0 m in China, four construction schemes of a metro station driven from a sectional shield tunnel with the expanding excavation were proposed. According to the main technical standards and construction dimensions of Linhexilu station in the Guangzhou No.3 metro line, the structures and construction schemes of this station were designed. Finally, the main related technical problems to be resolved were discussed, including construction steps, design method of station structure, design of special segment, environment control and project cost.

Key concepts: Shield, Metro station, Excavation, Civil engineering, Engineering, Tunnel construction, Line (geometry), Technical standard

Related papers

Back to paper searchBrowse research topicsOriginal source
Technical Schemes for Metro Station Construction Based on Shield Method — Research Paper | ScholarLens