Comparative Analysis of Schemes for Metro Station Built by Enlarging Large-Diameter Shield Tunnel

Mei Yan, Xiu Ren Yang, Ai Min Li, Wenjun Wang, De Yun Ding

Open full text 3 citations

Abstract

With the speedy development of Beijing mass transit, the land for metro engineering construction is becoming more and more insufficient; moreover, more and more complicated building environment problems are coming forth in future. In a complex building environment, how to choose available construction method to fast, safely and economically build metro engineering is worthy to be urgently studied in Beijing mass transit. Taking the experiment project of Beijing metro line No.14 as an engineering background, a new construction method that a running tunnel is firstly built by large-size shield method and then a metro station is constructed by shallow mining method to enlarge existing large-diameter shield tunnel is presented in this paper. Based on the building conditions of the experiment project, three architectural design schemes for the metro station and two kinds of construction plans are briefly introduced, and their advantages and disadvantages are analyzed as well. The new construction method can be used as a reference for the design and construction of metro engineering in China in the future.

About this research paper

What this paper is about

With the speedy development of Beijing mass transit, the land for metro engineering construction is becoming more and more insufficient; moreover, more and more complicated building environment problems are coming forth in future. In a complex building environment, how to choose available construction method to fast, safely and economically build metro engineering is worthy to be urgently studied in Beijing mass transit. Taking the experiment project of Beijing metro line No.14 as an engineering background, a new construction method that a running tunnel is firstly built by large-size shield method and then a metro station is constructed by shallow mining method to enlarge existing large-diameter shield tunnel is presented in this paper. Based on the building conditions of the experiment project, three architectural design schemes for the metro station and two kinds of construction plans are briefly introduced, and their advantages and disadvantages are analyzed as well. The new construction method can be used as a reference for the design and construction of metro engineering in China in the future.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

With the speedy development of Beijing mass transit, the land for metro engineering construction is becoming more and more insufficient; moreover, more and more complicated building environment problems are coming forth in future. In a complex building environment, how to choose available construction method to fast, safely and economically build metro engineering is worthy to be urgently studied in Beijing mass transit. Taking the experiment project of Beijing metro line No.14 as an engineering background, a new construction method that a running tunnel is firstly built by large-size shield method and then a metro station is constructed by shallow mining method to enlarge existing large-diameter shield tunnel is presented in this paper. Based on the building conditions of the experiment project, three architectural design schemes for the metro station and two kinds of construction plans are briefly introduced, and their advantages and disadvantages are analyzed as well. The new construction method can be used as a reference for the design and construction of metro engineering in China in the future.

Key concepts: Beijing, Shield, Civil engineering, Metro station, Engineering, Transit (satellite), Tunnel construction, Transport engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Comparative Analysis of Schemes for Metro Station Built by Enlarging Large-Diameter Shield Tunnel — Research Paper | ScholarLens