Application and Prospect Analysis of Large-Diameter Shield-Driven Tunnels Combined with Enlarged Metro Stations

Hong Li

Open publisher page 0 citations

Abstract

Considering that complex construction environments bring more and more challenges to metro construction, and based on the construction of the large-diameter shield-driven tunnel and enlarged station at the North Dongfeng Bridge- Jingshun Road section of Beijing Metro line 14, this paper discusses the problems encountered in the preliminary planning and design stage, such as a limited selection of alignments, a limited selection of construction methods, and rigorous external environment requirements. In this context, the combined construction method of a large-diameter shield-driven tunnel with an enlarged metro station is presented. Based on design optimization, process control, and a construction cost comparison, this construction method is proved to be technically feasible and cost effective.

About this research paper

What this paper is about

Considering that complex construction environments bring more and more challenges to metro construction, and based on the construction of the large-diameter shield-driven tunnel and enlarged station at the North Dongfeng Bridge- Jingshun Road section of Beijing Metro line 14, this paper discusses the problems encountered in the preliminary planning and design stage, such as a limited selection of alignments, a limited selection of construction methods, and rigorous external environment requirements. In this context, the combined construction method of a large-diameter shield-driven tunnel with an enlarged metro station is presented. Based on design optimization, process control, and a construction cost comparison, this construction method is proved to be technically feasible and cost effective.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Considering that complex construction environments bring more and more challenges to metro construction, and based on the construction of the large-diameter shield-driven tunnel and enlarged station at the North Dongfeng Bridge- Jingshun Road section of Beijing Metro line 14, this paper discusses the problems encountered in the preliminary planning and design stage, such as a limited selection of alignments, a limited selection of construction methods, and rigorous external environment requirements. In this context, the combined construction method of a large-diameter shield-driven tunnel with an enlarged metro station is presented. Based on design optimization, process control, and a construction cost comparison, this construction method is proved to be technically feasible and cost effective.

Key concepts: Shield, Bridge (graph theory), Context (archaeology), Engineering, Civil engineering, Beijing, Process (computing), Selection (genetic algorithm)