Construction of Long-Span Tied Arch Bridge
Jiang Hong
Abstract
Jiang Hong
Abstract
The structural character and the technical difficulty of tied arch bridge with concrete filled steel tubes of Wuchi River were analyzed.The construction method of the installation of rib steel pipes and the jack pumping technique of the concrete in the arch rib were introduced.The method of project quality control and project progresss management were summarized.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The structural character and the technical difficulty of tied arch bridge with concrete filled steel tubes of Wuchi River were analyzed.The construction method of the installation of rib steel pipes and the jack pumping technique of the concrete in the arch rib were introduced.The method of project quality control and project progresss management were summarized.
Key concepts: Arch, Bridge (graph theory), Arch bridge, Structural engineering, Span (engineering), Engineering, Beam bridge, Civil engineering