Asymmetric Construction of Steel Pipe Concrete Arch-rib Tied Arch Bridge
Zheng Li
Abstract
Zheng Li
Abstract
The main bridge of Anhui Huaiyuan Wohe River No 3 Bridge is steel pipe concrete tied arch bridge, adopted the construction method combining integral installation with asymmetric segmentation installation. It was locked in the abutment of arch to remove accumulative construction error. Concrete used in arch\|rib had the mixture ratio with such features as self\|floating, self\|planing and self\|compactablity to simplify the pouring method of steel pipe concrete.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The main bridge of Anhui Huaiyuan Wohe River No 3 Bridge is steel pipe concrete tied arch bridge, adopted the construction method combining integral installation with asymmetric segmentation installation. It was locked in the abutment of arch to remove accumulative construction error. Concrete used in arch\|rib had the mixture ratio with such features as self\|floating, self\|planing and self\|compactablity to simplify the pouring method of steel pipe concrete.
Key concepts: Arch, Arch bridge, Structural engineering, Bridge (graph theory), Engineering, Abutment, Geotechnical engineering, Medicine