2002Journal of Jinan Communications CollegeRequires access

The Arch Rib Construction and Control of the Steel-Pipe Concrete Tie-Rod Arch Bridge

Kong Xiang-fu

Open publisher page 0 citations

Abstract

According to the project example,this paper mainly introduces the process and installation of the arch rib steel pipes in the steel-pipe concrete tie-rod arch bridge,the proportion design of the concrete in the arch rib,the jack pumping technique and the monitoring process and method of construction.

About this research paper

What this paper is about

According to the project example,this paper mainly introduces the process and installation of the arch rib steel pipes in the steel-pipe concrete tie-rod arch bridge,the proportion design of the concrete in the arch rib,the jack pumping technique and the monitoring process and method of construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

According to the project example,this paper mainly introduces the process and installation of the arch rib steel pipes in the steel-pipe concrete tie-rod arch bridge,the proportion design of the concrete in the arch rib,the jack pumping technique and the monitoring process and method of construction.

Key concepts: Arch, Arch bridge, Bridge (graph theory), Structural engineering, Engineering, Forensic engineering, Anatomy, Medicine

Related papers

Back to paper searchBrowse research topicsOriginal source
The Arch Rib Construction and Control of the Steel-Pipe Concrete Tie-Rod Arch Bridge — Research Paper | ScholarLens