2011•Water Resources and Hydropower EngineeringRequires access

Construction scheme of tunneling through F_6 fault during construction of Jinping Hydropower Station II

Yajuan Wang

Open publisher page 0 citations

Abstract

The diversion tunnel group of Jinping Hydropower Station II has the characteristics of large embedded depth,long length,large diameter,high ground stress,etc.,and along which,the thickness of the overburden upon it is normally 1 500~2 000 m with the maximum of about 2 525 m;which is the only hydraulic water diversion tunnel in the world at present with largest length,largest embedded depth and largest hydraulic head.The tunnel is excavated through a zone with developed faults,among which the F6 fault is the largest one.Therefore,the tunneling though the fault becomes one of the most intractable problems.The successful treatment of this problem during the construction is briefly described herein.

About this research paper

What this paper is about

The diversion tunnel group of Jinping Hydropower Station II has the characteristics of large embedded depth,long length,large diameter,high ground stress,etc.,and along which,the thickness of the overburden upon it is normally 1 500~2 000 m with the maximum of about 2 525 m;which is the only hydraulic water diversion tunnel in the world at present with largest length,largest embedded depth and largest hydraulic head.The tunnel is excavated through a zone with developed faults,among which the F6 fault is the largest one.Therefore,the tunneling though the fault becomes one of the most intractable problems.The successful treatment of this problem during the construction is briefly described herein.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The diversion tunnel group of Jinping Hydropower Station II has the characteristics of large embedded depth,long length,large diameter,high ground stress,etc.,and along which,the thickness of the overburden upon it is normally 1 500~2 000 m with the maximum of about 2 525 m;which is the only hydraulic water diversion tunnel in the world at present with largest length,largest embedded depth and largest hydraulic head.The tunnel is excavated through a zone with developed faults,among which the F6 fault is the largest one.Therefore,the tunneling though the fault becomes one of the most intractable problems.The successful treatment of this problem during the construction is briefly described herein.

Key concepts: Overburden, Hydropower, Quantum tunnelling, Fault (geology), Water diversion, Geotechnical engineering, Head (geology), Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction scheme of tunneling through F_6 fault during construction of Jinping Hydropower Station II — Research Paper | ScholarLens