2009•Journal of Yangtze River Scientific Research InstituteRequires access

Three Dimensional Seepage Analysis on Diversion Tunnel of Jinping No.2 Hydropower Station

Yu Shao

Open publisher page 1 citations

Abstract

Jinping No.2 Hydropower Station is situated at the large river bend of the main stream of Yalon River in Sichuan Province.It is a diversion type hydropower station with the largest installed capacity on Yalon River.The diversion tunnel is 18-20 km long.It has large diameter and lies in very deep rock stratum.Owing to the very complicated geological conditions of rock stratum and insufficient technical data,back analysis method is used for determining the parameters.As the wide range of study field and the small dimension of the tunnel,the large model combined with small model is applied in the analysis.The analysis uses the continuous medium model.For the large structure face,such as fault,a thin layer water conduction element is used to simulate its conductivity.From the analysis,the maximum leakage of the tunnel during construction is predicted.The impact of tunnel excavation on the surrounding environment is evaluated.

About this research paper

What this paper is about

Jinping No.2 Hydropower Station is situated at the large river bend of the main stream of Yalon River in Sichuan Province.It is a diversion type hydropower station with the largest installed capacity on Yalon River.The diversion tunnel is 18-20 km long.It has large diameter and lies in very deep rock stratum.Owing to the very complicated geological conditions of rock stratum and insufficient technical data,back analysis method is used for determining the parameters.As the wide range of study field and the small dimension of the tunnel,the large model combined with small model is applied in the analysis.The analysis uses the continuous medium model.For the large structure face,such as fault,a thin layer water conduction element is used to simulate its conductivity.From the analysis,the maximum leakage of the tunnel during construction is predicted.The impact of tunnel excavation on the surrounding environment is evaluated.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Jinping No.2 Hydropower Station is situated at the large river bend of the main stream of Yalon River in Sichuan Province.It is a diversion type hydropower station with the largest installed capacity on Yalon River.The diversion tunnel is 18-20 km long.It has large diameter and lies in very deep rock stratum.Owing to the very complicated geological conditions of rock stratum and insufficient technical data,back analysis method is used for determining the parameters.As the wide range of study field and the small dimension of the tunnel,the large model combined with small model is applied in the analysis.The analysis uses the continuous medium model.For the large structure face,such as fault,a thin layer water conduction element is used to simulate its conductivity.From the analysis,the maximum leakage of the tunnel during construction is predicted.The impact of tunnel excavation on the surrounding environment is evaluated.

Key concepts: Excavation, Hydropower, Geotechnical engineering, Stratum, Water diversion, Geology, Mining engineering, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Three Dimensional Seepage Analysis on Diversion Tunnel of Jinping No.2 Hydropower Station — Research Paper | ScholarLens