2010•Water Resources and Hydropower EngineeringRequires access

Main technologies for construction of diversion tunnels of Jinping Hydropower Station II

YU Xiao-dong

Open publisher page 0 citations

Abstract

The four diversion tunnels of Jinping Hydropower Station II are under a complicated hydro-geological condition with the characteristics of long tunnel axis of about 16.67 km,deep buried depth of about 1 500~2 000 m and large excavation diameter of about 13.0~13.8 m.In accordance with the specific construction condition therein,the technical measures such as geological prediction,control and prevention of rock burst,sudden water inrush,etc.are made,and then all the problems of deep buried depth,high geo-stress,sudden water inrush with large flow rate,strong rockburst,etc.are better solved with both the introduce world-advanced equipments and the self-developed horizontal curved face slip-form;which can provide a reference for the similar project.

About this research paper

What this paper is about

The four diversion tunnels of Jinping Hydropower Station II are under a complicated hydro-geological condition with the characteristics of long tunnel axis of about 16.67 km,deep buried depth of about 1 500~2 000 m and large excavation diameter of about 13.0~13.8 m.In accordance with the specific construction condition therein,the technical measures such as geological prediction,control and prevention of rock burst,sudden water inrush,etc.are made,and then all the problems of deep buried depth,high geo-stress,sudden water inrush with large flow rate,strong rockburst,etc.are better solved with both the introduce world-advanced equipments and the self-developed horizontal curved face slip-form;which can provide a reference for the similar project.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The four diversion tunnels of Jinping Hydropower Station II are under a complicated hydro-geological condition with the characteristics of long tunnel axis of about 16.67 km,deep buried depth of about 1 500~2 000 m and large excavation diameter of about 13.0~13.8 m.In accordance with the specific construction condition therein,the technical measures such as geological prediction,control and prevention of rock burst,sudden water inrush,etc.are made,and then all the problems of deep buried depth,high geo-stress,sudden water inrush with large flow rate,strong rockburst,etc.are better solved with both the introduce world-advanced equipments and the self-developed horizontal curved face slip-form;which can provide a reference for the similar project.

Key concepts: Inrush current, Hydropower, Excavation, Water diversion, Rock burst, Mining engineering, Geotechnical engineering, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Main technologies for construction of diversion tunnels of Jinping Hydropower Station II — Research Paper | ScholarLens