2009Journal of China Institute of Water Resources and Hydropower ResearchRequires access

Prediction and protection of water quality for emergency water supply project of the Beijing section of the Middle Route Project of the South-to-North Water Transfer

Zhu Qiu-mei

Open publisher page 0 citations

Abstract

The emergency water supply project of the Beijing Section of the Middle Route Project of the South-to-North Water Transfer has been constructed,aiming at solving the water issues in Beijing before the whole Project is completely operated.An enclosed conduit,80.3km in length,is used in this section,which could effectively avoid water pollution on the way,but would weaken the re-oxygenation ability of water.Thus the transfer water quality is predicted by a comparative analysis of the water in the pipe culverts between the Miyun Reservoir and No.9 Waterworks.Other relevant impacts are also studied.Based on the study,some countermeasures for water quality protection are put forward accordingly.

About this research paper

What this paper is about

The emergency water supply project of the Beijing Section of the Middle Route Project of the South-to-North Water Transfer has been constructed,aiming at solving the water issues in Beijing before the whole Project is completely operated.An enclosed conduit,80.3km in length,is used in this section,which could effectively avoid water pollution on the way,but would weaken the re-oxygenation ability of water.Thus the transfer water quality is predicted by a comparative analysis of the water in the pipe culverts between the Miyun Reservoir and No.9 Waterworks.Other relevant impacts are also studied.Based on the study,some countermeasures for water quality protection are put forward accordingly.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The emergency water supply project of the Beijing Section of the Middle Route Project of the South-to-North Water Transfer has been constructed,aiming at solving the water issues in Beijing before the whole Project is completely operated.An enclosed conduit,80.3km in length,is used in this section,which could effectively avoid water pollution on the way,but would weaken the re-oxygenation ability of water.Thus the transfer water quality is predicted by a comparative analysis of the water in the pipe culverts between the Miyun Reservoir and No.9 Waterworks.Other relevant impacts are also studied.Based on the study,some countermeasures for water quality protection are put forward accordingly.

Key concepts: Water transfer, Beijing, Water supply, Section (typography), Water quality, Culvert, Water diversion, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Prediction and protection of water quality for emergency water supply project of the Beijing section of the Middle Route Project of the South-to-North Water Transfer — Research Paper | ScholarLens