2010Water Resources & Hydropower of Northeast ChinaRequires access

Safety monitoring in flowing water stage for the emergency water supply project in Beijing-Shijiazhuang section of middle route of South to north water diversion

MA Hong-lian

Open publisher page 0 citations

Abstract

The main channel length is about 307.422km for the emergency water supply project in Beijing-Shijiazhuang section of middle route of South to north water diversion,south to the ancient canal on the south of Hutuo river in Hebei province and north to Tuancheng lake in Beijing city.By analyzing the monitoring data results of these buildings along the channel during the temporary flowing water stage,the paper estimates the security of these buildings,which could provide the running basis for the operation and management apartment and the reference for the design and construction of the similar projects.

About this research paper

What this paper is about

The main channel length is about 307.422km for the emergency water supply project in Beijing-Shijiazhuang section of middle route of South to north water diversion,south to the ancient canal on the south of Hutuo river in Hebei province and north to Tuancheng lake in Beijing city.By analyzing the monitoring data results of these buildings along the channel during the temporary flowing water stage,the paper estimates the security of these buildings,which could provide the running basis for the operation and management apartment and the reference for the design and construction of the similar projects.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The main channel length is about 307.422km for the emergency water supply project in Beijing-Shijiazhuang section of middle route of South to north water diversion,south to the ancient canal on the south of Hutuo river in Hebei province and north to Tuancheng lake in Beijing city.By analyzing the monitoring data results of these buildings along the channel during the temporary flowing water stage,the paper estimates the security of these buildings,which could provide the running basis for the operation and management apartment and the reference for the design and construction of the similar projects.

Key concepts: Beijing, Water diversion, Water supply, Water resource management, Stage (stratigraphy), Section (typography), Channel (broadcasting), Water resources

Related papers

Back to paper searchBrowse research topicsOriginal source
Safety monitoring in flowing water stage for the emergency water supply project in Beijing-Shijiazhuang section of middle route of South to north water diversion — Research Paper | ScholarLens