2009Water Resources and Hydropower EngineeringRequires access

Key technical problems during design and construction of emergency water supply project for Beijing-Shijiazhuang section in Mid-route of South-to-North Water Transfer Project

Yisen Wang

Open publisher page 0 citations

Abstract

The emergency water supply project for Beijing-Shijiazhuang section in Mid-route of South-to-North Water Transfer Project starts from the underdrain intake of the ancient canal in Shijianzhuang to the Lake Tuancheng in Beijing with a total water transfer distance of 307 km.The key technical problems during both the design and the construction are: engineering problems from pre-stress cylinder concrete pipe(PCCP);construction technique of crossing Wukesong Subway Station,Express Way and Cloverleaf Junctions of West Fourth Ring Road;application of large canal concrete paver;design of large discharge 3-D pre-stressed water conveyance aqueduct and the control measures for cracking of the aqueduct body.

About this research paper

What this paper is about

The emergency water supply project for Beijing-Shijiazhuang section in Mid-route of South-to-North Water Transfer Project starts from the underdrain intake of the ancient canal in Shijianzhuang to the Lake Tuancheng in Beijing with a total water transfer distance of 307 km.The key technical problems during both the design and the construction are: engineering problems from pre-stress cylinder concrete pipe(PCCP);construction technique of crossing Wukesong Subway Station,Express Way and Cloverleaf Junctions of West Fourth Ring Road;application of large canal concrete paver;design of large discharge 3-D pre-stressed water conveyance aqueduct and the control measures for cracking of the aqueduct body.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The emergency water supply project for Beijing-Shijiazhuang section in Mid-route of South-to-North Water Transfer Project starts from the underdrain intake of the ancient canal in Shijianzhuang to the Lake Tuancheng in Beijing with a total water transfer distance of 307 km.The key technical problems during both the design and the construction are: engineering problems from pre-stress cylinder concrete pipe(PCCP);construction technique of crossing Wukesong Subway Station,Express Way and Cloverleaf Junctions of West Fourth Ring Road;application of large canal concrete paver;design of large discharge 3-D pre-stressed water conveyance aqueduct and the control measures for cracking of the aqueduct body.

Key concepts: Aqueduct, Water transfer, Beijing, Water diversion, Civil engineering, Water supply, Engineering, Section (typography)