Discussion on Guangzhou power transmission network plan of the 11th Five-Year Plan
Lan Zhang, Bin Zhang
Abstract
Lan Zhang, Bin Zhang
Abstract
This paper introduces the current situation of Guangzhou power transmission network,analyzes the main problems in existing network,studies the services carried by the network and raises the plan for upgrading and new-constructed network during the 11th Five-Year Plan period.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper introduces the current situation of Guangzhou power transmission network,analyzes the main problems in existing network,studies the services carried by the network and raises the plan for upgrading and new-constructed network during the 11th Five-Year Plan period.
Key concepts: Plan (archaeology), Transmission network, Power network, Transmission (telecommunications), Power transmission, Five year plan, Network planning and design, Telecommunications