2006Telecommunications for Electric Power SystemRequires access

Discussion on Guangzhou power transmission network plan of the 11th Five-Year Plan

Lan Zhang, Bin Zhang

Open publisher page 1 citations

Abstract

This paper introduces the current situation of Guangzhou power transmission network,analyzes the main problems in existing network,studies the services carried by the network and raises the plan for upgrading and new-constructed network during the 11th Five-Year Plan period.

About this research paper

What this paper is about

This paper introduces the current situation of Guangzhou power transmission network,analyzes the main problems in existing network,studies the services carried by the network and raises the plan for upgrading and new-constructed network during the 11th Five-Year Plan period.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper introduces the current situation of Guangzhou power transmission network,analyzes the main problems in existing network,studies the services carried by the network and raises the plan for upgrading and new-constructed network during the 11th Five-Year Plan period.

Key concepts: Plan (archaeology), Transmission network, Power network, Transmission (telecommunications), Power transmission, Five year plan, Network planning and design, Telecommunications

Related papers

Back to paper searchBrowse research topicsOriginal source
Discussion on Guangzhou power transmission network plan of the 11th Five-Year Plan — Research Paper | ScholarLens