THE MONITOR MEASURING OF HIGHWAY TUNNEL IN NATM
H Wang
Abstract
H Wang
Abstract
It is important that monitor measuring is applied in tunnel in regard to new Austrian tunneling method.The monitor measuring of NATM was studied in the new Tianpingling Tunnel in Guangqing Highway.Based on the regularity and conditions of the surrounding rock deformation of monitor measuring in site,the optimum time for primary and permanent support are obtained,which averts successfully accidents in construction,enhances the construction qualities and guidance to tunnel construction in harmful geological structure areas.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
It is important that monitor measuring is applied in tunnel in regard to new Austrian tunneling method.The monitor measuring of NATM was studied in the new Tianpingling Tunnel in Guangqing Highway.Based on the regularity and conditions of the surrounding rock deformation of monitor measuring in site,the optimum time for primary and permanent support are obtained,which averts successfully accidents in construction,enhances the construction qualities and guidance to tunnel construction in harmful geological structure areas.
Key concepts: New Austrian Tunnelling method, Tunnel construction, Railway tunnel, Engineering, Deformation monitoring, Quantum tunnelling, Civil engineering, Geotechnical engineering