2011Low Temperature Architecture TechnologyRequires access

THE MONITOR MEASURING OF HIGHWAY TUNNEL IN NATM

H Wang

Open publisher page 0 citations

Abstract

It is important that monitor measuring is applied in tunnel in regard to new Austrian tunneling method.The monitor measuring of NATM was studied in the new Tianpingling Tunnel in Guangqing Highway.Based on the regularity and conditions of the surrounding rock deformation of monitor measuring in site,the optimum time for primary and permanent support are obtained,which averts successfully accidents in construction,enhances the construction qualities and guidance to tunnel construction in harmful geological structure areas.

About this research paper

What this paper is about

It is important that monitor measuring is applied in tunnel in regard to new Austrian tunneling method.The monitor measuring of NATM was studied in the new Tianpingling Tunnel in Guangqing Highway.Based on the regularity and conditions of the surrounding rock deformation of monitor measuring in site,the optimum time for primary and permanent support are obtained,which averts successfully accidents in construction,enhances the construction qualities and guidance to tunnel construction in harmful geological structure areas.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

It is important that monitor measuring is applied in tunnel in regard to new Austrian tunneling method.The monitor measuring of NATM was studied in the new Tianpingling Tunnel in Guangqing Highway.Based on the regularity and conditions of the surrounding rock deformation of monitor measuring in site,the optimum time for primary and permanent support are obtained,which averts successfully accidents in construction,enhances the construction qualities and guidance to tunnel construction in harmful geological structure areas.

Key concepts: New Austrian Tunnelling method, Tunnel construction, Railway tunnel, Engineering, Deformation monitoring, Quantum tunnelling, Civil engineering, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
THE MONITOR MEASURING OF HIGHWAY TUNNEL IN NATM — Research Paper | ScholarLens