2004Journal of Chongqing University. English EditionRequires access

The Monitor Measuring of Highway Tunnel in Natm

Dai Gao-fei, Ying Shong, Xia Cai-chu, Mao Hai-he

Open publisher page 3 citations

Abstract

It is important that monitor measuring is applied in tunnel in regard to NATM. The monitor measuring of NATM was studied in the Fengmeiya Tunnel in Chongzun Express. Based on the regularity and conditions of the surrounding rock deformation of monitor measuring in site, the optimum time for primary and permanent support are obtained which averting successfully accidents in construction, enhancing the construction qualities and guidance to tunnel construction in Karst areas.

About this research paper

What this paper is about

It is important that monitor measuring is applied in tunnel in regard to NATM. The monitor measuring of NATM was studied in the Fengmeiya Tunnel in Chongzun Express. Based on the regularity and conditions of the surrounding rock deformation of monitor measuring in site, the optimum time for primary and permanent support are obtained which averting successfully accidents in construction, enhancing the construction qualities and guidance to tunnel construction in Karst areas.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

It is important that monitor measuring is applied in tunnel in regard to NATM. The monitor measuring of NATM was studied in the Fengmeiya Tunnel in Chongzun Express. Based on the regularity and conditions of the surrounding rock deformation of monitor measuring in site, the optimum time for primary and permanent support are obtained which averting successfully accidents in construction, enhancing the construction qualities and guidance to tunnel construction in Karst areas.

Key concepts: New Austrian Tunnelling method, Railway tunnel, Karst, Tunnel construction, Engineering, Deformation monitoring, Water tunnel, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
The Monitor Measuring of Highway Tunnel in Natm — Research Paper | ScholarLens