2006Journal of Chongqing Jiaotong UniversityRequires access

Monitoring during the exit NATM constrction of dongmenguan tunnel

XU Lin-sheng

Open publisher page 0 citations

Abstract

The site monitoring was made during the exit construction of Dongmenguan highway tunnel.By means of the monitoring and detailed analysis for each construction stage,feedback controlling desin is realized and the NATM construction is controlled.

About this research paper

What this paper is about

The site monitoring was made during the exit construction of Dongmenguan highway tunnel.By means of the monitoring and detailed analysis for each construction stage,feedback controlling desin is realized and the NATM construction is controlled.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The site monitoring was made during the exit construction of Dongmenguan highway tunnel.By means of the monitoring and detailed analysis for each construction stage,feedback controlling desin is realized and the NATM construction is controlled.

Key concepts: New Austrian Tunnelling method, Tunnel construction, Engineering, Civil engineering, Geotechnical engineering, Excavation

Related papers

Back to paper searchBrowse research topicsOriginal source
Monitoring during the exit NATM constrction of dongmenguan tunnel — Research Paper | ScholarLens