Monitoring during the exit NATM constrction of dongmenguan tunnel
XU Lin-sheng
Abstract
XU Lin-sheng
Abstract
The site monitoring was made during the exit construction of Dongmenguan highway tunnel.By means of the monitoring and detailed analysis for each construction stage,feedback controlling desin is realized and the NATM construction is controlled.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The site monitoring was made during the exit construction of Dongmenguan highway tunnel.By means of the monitoring and detailed analysis for each construction stage,feedback controlling desin is realized and the NATM construction is controlled.
Key concepts: New Austrian Tunnelling method, Tunnel construction, Engineering, Civil engineering, Geotechnical engineering, Excavation