2007West-china Exploration EngineeringRequires access

Monitoring and Application in Shijialiang Tunnel

Liu Li

Open publisher page 0 citations

Abstract

Combine the needs of the NATM construction,the reguired and the optional items of shijialiang tunnel were determined which is located at the north part of Chongqing highway.The paper introduction the major monitoring control methods,and also the influence with Shijialiang tunnel and Xinlongfeng railway.

About this research paper

What this paper is about

Combine the needs of the NATM construction,the reguired and the optional items of shijialiang tunnel were determined which is located at the north part of Chongqing highway.The paper introduction the major monitoring control methods,and also the influence with Shijialiang tunnel and Xinlongfeng railway.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Combine the needs of the NATM construction,the reguired and the optional items of shijialiang tunnel were determined which is located at the north part of Chongqing highway.The paper introduction the major monitoring control methods,and also the influence with Shijialiang tunnel and Xinlongfeng railway.

Key concepts: New Austrian Tunnelling method, Tunnel construction, Railway tunnel, Civil engineering, Engineering, Transport engineering, Computer science, Construction engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Monitoring and Application in Shijialiang Tunnel — Research Paper | ScholarLens