The blasting experiments of demolition of the downstream longitudinal RCC cofferdam at Gaobazhou Power Station is introduced. On the basis of the information obtained from the site experiment, the design of blasting demolition the cofferdam was carried out. The result of the production blasting and its influencing factors were analyzed.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The blasting experiments of demolition of the downstream longitudinal RCC cofferdam at Gaobazhou Power Station is introduced. On the basis of the information obtained from the site experiment, the design of blasting demolition the cofferdam was carried out. The result of the production blasting and its influencing factors were analyzed.
Key concepts: Cofferdam, Demolition, Rock blasting, Engineering, Drilling and blasting, Geotechnical engineering, Environmental science, Civil engineering