2001Engineering BlastingRequires access

BLASTING DEMOLITION OF A LONGITUDINAL COFFERDAM IN DAYUANDU RIVER

Qi Zhou

Open publisher page 0 citations

Abstract

A longitudinal concrete cofferdam was demolished by way of underwater controlled blasting. The calculation of maximum charge weight per delayed interval, the design of drilling and charging structure, initiation network and others were introduced. Main blasting safety precautions were discussed in detail. In the light of this engineering example, some views on the arrangement and blasting demolition of a longitudinal cofferdam were put forward.

About this research paper

What this paper is about

A longitudinal concrete cofferdam was demolished by way of underwater controlled blasting. The calculation of maximum charge weight per delayed interval, the design of drilling and charging structure, initiation network and others were introduced. Main blasting safety precautions were discussed in detail. In the light of this engineering example, some views on the arrangement and blasting demolition of a longitudinal cofferdam were put forward.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A longitudinal concrete cofferdam was demolished by way of underwater controlled blasting. The calculation of maximum charge weight per delayed interval, the design of drilling and charging structure, initiation network and others were introduced. Main blasting safety precautions were discussed in detail. In the light of this engineering example, some views on the arrangement and blasting demolition of a longitudinal cofferdam were put forward.

Key concepts: Cofferdam, Demolition, Rock blasting, Drilling and blasting, Engineering, Underwater, Geotechnical engineering, Drilling

Related papers

Back to paper searchBrowse research topicsOriginal source
BLASTING DEMOLITION OF A LONGITUDINAL COFFERDAM IN DAYUANDU RIVER — Research Paper | ScholarLens