STUDY ON DEMOLITION BLASTING OF TGP'S III-PHASE UPSTREAM RCC COFFERDAM
Zhang Zheng-yu
Abstract
Zhang Zheng-yu
Abstract
The combination of inclined blasting of burying the barrel chambers at center-section 380 meters of the cofferdam and the deep-hole blasting at the two ends was employed in Three Gorges Project's Ⅲ-phase upstream roll compact concrete cofferdam demolition.The paper analyzed the reliability of the cofferdam and described in detail the design of the blasting parameters and ignition network.The paper also briefly introduced the blasting construction and the blasting effect.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The combination of inclined blasting of burying the barrel chambers at center-section 380 meters of the cofferdam and the deep-hole blasting at the two ends was employed in Three Gorges Project's Ⅲ-phase upstream roll compact concrete cofferdam demolition.The paper analyzed the reliability of the cofferdam and described in detail the design of the blasting parameters and ignition network.The paper also briefly introduced the blasting construction and the blasting effect.
Key concepts: Cofferdam, Rock blasting, Demolition, Three gorges, Engineering, Upstream (networking), Geotechnical engineering, Civil engineering