Cofferdam demolition blasting and vibration monitoring for Yahekou Thermal Power Station
Yongzhe Zhang
Abstract
Yongzhe Zhang
Abstract
On the basis of the topography and construction conditions of Yahekou Thermal Power Station Water Supply Engineering, a detail blasting plan was prepared for construction cofferdam demolition, and the blasting process is monitored and analyzed. The blasting effect indicated that the blasting plan is reasonable.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
On the basis of the topography and construction conditions of Yahekou Thermal Power Station Water Supply Engineering, a detail blasting plan was prepared for construction cofferdam demolition, and the blasting process is monitored and analyzed. The blasting effect indicated that the blasting plan is reasonable.
Key concepts: Cofferdam, Demolition, Rock blasting, Engineering, Thermal power station, Power station, Geotechnical engineering, Civil engineering