Construction of Concrete-Filled Steel Tube Arches of the 2nd Zhengzhou Huanghe River Bridge
Ying Liu
Abstract
Ying Liu
Abstract
The 2nd Zhengzhou Huanghe River Bridge proper is designed as 8×100 m simply-supported tied arch spans of concrete-filled steel tubes over the wide and braided reach in the midstream of Huanghe River. In the construction of the Bridge, the construction scheme of two-side construction trestles plus gantry cranes over piers are used. In this paper, the methods for fabrication and installation of the steel tube arches, and construction control points are described in particular.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The 2nd Zhengzhou Huanghe River Bridge proper is designed as 8×100 m simply-supported tied arch spans of concrete-filled steel tubes over the wide and braided reach in the midstream of Huanghe River. In the construction of the Bridge, the construction scheme of two-side construction trestles plus gantry cranes over piers are used. In this paper, the methods for fabrication and installation of the steel tube arches, and construction control points are described in particular.
Key concepts: Arch, Bridge (graph theory), Engineering, Midstream, Arch bridge, Structural engineering, Tube (container), Civil engineering