Construction Techniques for Pumping-up of Concrete into Steel Tubes of the 4th Qiantangjiang River Bridge in Hangzhou
Wang Jie-yun
Abstract
Wang Jie-yun
Abstract
The superstructure of main bridge of the 4th Qiantangjiang River Bridge is an 11-span concrete-filled steel tube tied arch bridge with the largest diameter of the arch rib steel tube 170 cm.In this paper,the mix proportioning design of the concrete filled into the steel tubes of the Bridge and concrete construction technology by pumping-up method are presented,and the quality control and inspection for the concrete in the tubes are described as well.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The superstructure of main bridge of the 4th Qiantangjiang River Bridge is an 11-span concrete-filled steel tube tied arch bridge with the largest diameter of the arch rib steel tube 170 cm.In this paper,the mix proportioning design of the concrete filled into the steel tubes of the Bridge and concrete construction technology by pumping-up method are presented,and the quality control and inspection for the concrete in the tubes are described as well.
Key concepts: Bridge (graph theory), Arch bridge, Structural engineering, Engineering, Span (engineering), Arch, Beam bridge, Tube (container)