2008Pearl RiverRequires access

Water and Silt Simulation Modeling Study for the Area Surrounding Nansha Reach of Guangzhou Harbor

Jun Chen

Open publisher page 0 citations

Abstract

Nansha Reach of Guangzhou Harbor is located at the junction of the discharge from Jiaomen and Humen Outlets and the upcoming tide from Lingdingyang Bay,which have complicated the hydrodynamic conditions.The recent rapid development of the Jibaosha Reclamation Project has brought changes to the boundary and the hydrodynamic conditions.In order to analyze the impacts of those changes to the harbor,the mathematical models with the dynamic simulation have been developed to analyze the impact of the extension of the Jibaosha Area on the Harbor.Countermeasures are figured out to mitigate the negative influence of the sediment.

About this research paper

What this paper is about

Nansha Reach of Guangzhou Harbor is located at the junction of the discharge from Jiaomen and Humen Outlets and the upcoming tide from Lingdingyang Bay,which have complicated the hydrodynamic conditions.The recent rapid development of the Jibaosha Reclamation Project has brought changes to the boundary and the hydrodynamic conditions.In order to analyze the impacts of those changes to the harbor,the mathematical models with the dynamic simulation have been developed to analyze the impact of the extension of the Jibaosha Area on the Harbor.Countermeasures are figured out to mitigate the negative influence of the sediment.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Nansha Reach of Guangzhou Harbor is located at the junction of the discharge from Jiaomen and Humen Outlets and the upcoming tide from Lingdingyang Bay,which have complicated the hydrodynamic conditions.The recent rapid development of the Jibaosha Reclamation Project has brought changes to the boundary and the hydrodynamic conditions.In order to analyze the impacts of those changes to the harbor,the mathematical models with the dynamic simulation have been developed to analyze the impact of the extension of the Jibaosha Area on the Harbor.Countermeasures are figured out to mitigate the negative influence of the sediment.

Key concepts: Land reclamation, Bay, Silt, Environmental science, Hydrology (agriculture), Sediment, Boundary (topology), Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Water and Silt Simulation Modeling Study for the Area Surrounding Nansha Reach of Guangzhou Harbor — Research Paper | ScholarLens