2005Pearl RiverRequires access

Analysis of Numerical Modeling of Effects of Sand Borrowing in Nansha HarborWaters on the Operation of the Harbor

Jun Liu

Open publisher page 1 citations

Abstract

During the construction of the Stage I Project of Nansha Harbor reach;non_native sand dredgers often enter the waters of construction area to carry out sand borrowing.This not only has disturbed the normal construction in the fiedl,but also brought about hidden danger to the safety of the ferry.A two_dimensional numerical model of flow and sediment is established to simulate the effects of sand borrowing in waters of Nansha Harbor reach on hydrodynamic conditions and sediment movement in Nansha Harbor reach and analize its advantages and disadvantages.Rational suggestions are put forward for sand borrowing in waters near the harbor reach.

About this research paper

What this paper is about

During the construction of the Stage I Project of Nansha Harbor reach;non_native sand dredgers often enter the waters of construction area to carry out sand borrowing.This not only has disturbed the normal construction in the fiedl,but also brought about hidden danger to the safety of the ferry.A two_dimensional numerical model of flow and sediment is established to simulate the effects of sand borrowing in waters of Nansha Harbor reach on hydrodynamic conditions and sediment movement in Nansha Harbor reach and analize its advantages and disadvantages.Rational suggestions are put forward for sand borrowing in waters near the harbor reach.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

During the construction of the Stage I Project of Nansha Harbor reach;non_native sand dredgers often enter the waters of construction area to carry out sand borrowing.This not only has disturbed the normal construction in the fiedl,but also brought about hidden danger to the safety of the ferry.A two_dimensional numerical model of flow and sediment is established to simulate the effects of sand borrowing in waters of Nansha Harbor reach on hydrodynamic conditions and sediment movement in Nansha Harbor reach and analize its advantages and disadvantages.Rational suggestions are put forward for sand borrowing in waters near the harbor reach.

Key concepts: Sediment, Flow (mathematics), Hydrology (agriculture), Geology, Environmental science, Geotechnical engineering, Mining engineering, Geomorphology

Related papers

Back to paper searchBrowse research topicsOriginal source
Analysis of Numerical Modeling of Effects of Sand Borrowing in Nansha HarborWaters on the Operation of the Harbor — Research Paper | ScholarLens