Overall Quality Control for Penstock Making & Installing of Yinzidu Hydropower Station

Tong De-yuan

Open publisher page 0 citations

Abstract

A conduit tunnel supplies water for three units,this is a feature of diversion system of Yinzidu Hydropower Station.Its penstock is unusual because its diameter is large,head bore by it is high and its HD is up to (1 600 m~2).The designer has raised stricter requirement to quality and examining than the standards because that the maximum inscribed ball diameter of the two fork tubs is 102 m,the geological conditions of the surrounding rock are unfavorable as well as its construction schedule is pressing.Penstock making and installing,therefore,were controlled from start to end.The contradictory among quality,safety and schedule was successfully solved and satisfactory engineering results are obtained.

About this research paper

What this paper is about

A conduit tunnel supplies water for three units,this is a feature of diversion system of Yinzidu Hydropower Station.Its penstock is unusual because its diameter is large,head bore by it is high and its HD is up to (1 600 m~2).The designer has raised stricter requirement to quality and examining than the standards because that the maximum inscribed ball diameter of the two fork tubs is 102 m,the geological conditions of the surrounding rock are unfavorable as well as its construction schedule is pressing.Penstock making and installing,therefore,were controlled from start to end.The contradictory among quality,safety and schedule was successfully solved and satisfactory engineering results are obtained.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A conduit tunnel supplies water for three units,this is a feature of diversion system of Yinzidu Hydropower Station.Its penstock is unusual because its diameter is large,head bore by it is high and its HD is up to (1 600 m~2).The designer has raised stricter requirement to quality and examining than the standards because that the maximum inscribed ball diameter of the two fork tubs is 102 m,the geological conditions of the surrounding rock are unfavorable as well as its construction schedule is pressing.Penstock making and installing,therefore,were controlled from start to end.The contradictory among quality,safety and schedule was successfully solved and satisfactory engineering results are obtained.

Key concepts: Penstock, Installation, Electrical conduit, Hydropower, Hoist (device), Engineering, Spillway, Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Overall Quality Control for Penstock Making & Installing of Yinzidu Hydropower Station — Research Paper | ScholarLens