On penstock and bifurcated pipe designing in Yinzidu hydropower station
Yao Yuan-cheng
Abstract
Yao Yuan-cheng
Abstract
Based on the features and project scale of Yinzidu hydropower project,large steel bifurcated pipe layout,which made it safe,rational and economic was studied in combination with primary design calculation.Therefore it could meet the operation re-quirement.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Based on the features and project scale of Yinzidu hydropower project,large steel bifurcated pipe layout,which made it safe,rational and economic was studied in combination with primary design calculation.Therefore it could meet the operation re-quirement.
Key concepts: Penstock, Hydropower, Engineering, Civil engineering, Scale (ratio), Structural engineering, Construction engineering, Quantum mechanics