2004•Large Dam and SafetyRequires access

On penstock and bifurcated pipe designing in Yinzidu hydropower station

Yao Yuan-cheng

Open publisher page 0 citations

Abstract

Based on the features and project scale of Yinzidu hydropower project,large steel bifurcated pipe layout,which made it safe,rational and economic was studied in combination with primary design calculation.Therefore it could meet the operation re-quirement.

About this research paper

What this paper is about

Based on the features and project scale of Yinzidu hydropower project,large steel bifurcated pipe layout,which made it safe,rational and economic was studied in combination with primary design calculation.Therefore it could meet the operation re-quirement.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Based on the features and project scale of Yinzidu hydropower project,large steel bifurcated pipe layout,which made it safe,rational and economic was studied in combination with primary design calculation.Therefore it could meet the operation re-quirement.

Key concepts: Penstock, Hydropower, Engineering, Civil engineering, Scale (ratio), Structural engineering, Construction engineering, Quantum mechanics

Related papers

Back to paper searchBrowse research topicsOriginal source
On penstock and bifurcated pipe designing in Yinzidu hydropower station — Research Paper | ScholarLens