On power conduit system construction and its quality control in Yinzidu hydropower station
Tang De-yuan
Abstract
Tang De-yuan
Abstract
A conduit tunnel supplies water for three units,the higher intake tower and shaft,larger diameter of tunnel and penstock,poor geological condition features largely in the system.By study we have adopted many new construction technologies and tech-niques to get better effect in rapid constructing,good quality and putting into operation ahead.This paper summarizes the experi-ence of construction and quality control.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
A conduit tunnel supplies water for three units,the higher intake tower and shaft,larger diameter of tunnel and penstock,poor geological condition features largely in the system.By study we have adopted many new construction technologies and tech-niques to get better effect in rapid constructing,good quality and putting into operation ahead.This paper summarizes the experi-ence of construction and quality control.
Key concepts: Electrical conduit, Penstock, Hydropower, Tower, Engineering, Civil engineering, Quality (philosophy), Control (management)