On making and installing bifurcated pipe of penstock in Yinzidu hydropower station
MA Zhen-yuan
Abstract
MA Zhen-yuan
Abstract
The bifurcated pipe of penstock in Yinzidu hydropower station is now the largest one in its scale.This paper mainly intro-duces the detailed working procedure for material cutting,bending,pre-making-up,transporting,welding and installing.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The bifurcated pipe of penstock in Yinzidu hydropower station is now the largest one in its scale.This paper mainly intro-duces the detailed working procedure for material cutting,bending,pre-making-up,transporting,welding and installing.
Key concepts: Penstock, Installation, Hydropower, Electrical conduit, Civil engineering, Engineering, Marine engineering, Geology