2004•Large Dam and SafetyRequires access

On making and installing bifurcated pipe of penstock in Yinzidu hydropower station

MA Zhen-yuan

Open publisher page 0 citations

Abstract

The bifurcated pipe of penstock in Yinzidu hydropower station is now the largest one in its scale.This paper mainly intro-duces the detailed working procedure for material cutting,bending,pre-making-up,transporting,welding and installing.

About this research paper

What this paper is about

The bifurcated pipe of penstock in Yinzidu hydropower station is now the largest one in its scale.This paper mainly intro-duces the detailed working procedure for material cutting,bending,pre-making-up,transporting,welding and installing.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The bifurcated pipe of penstock in Yinzidu hydropower station is now the largest one in its scale.This paper mainly intro-duces the detailed working procedure for material cutting,bending,pre-making-up,transporting,welding and installing.

Key concepts: Penstock, Installation, Hydropower, Electrical conduit, Civil engineering, Engineering, Marine engineering, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
On making and installing bifurcated pipe of penstock in Yinzidu hydropower station — Research Paper | ScholarLens