Stability Analysis for Shallow-buried Section of High-speed Railway Tunnel
Yao Xiang-yu
Abstract
Yao Xiang-yu
Abstract
During the tunnel construction,Monitoring measurement is one of the three elements of New Austrian Method Construction for Tunnel.Data are obtained by observing and measuring the settlement of Dongnong Tunnel Vault and periphery displacement of Yungui Railway.The mathematical model is established by means of regression analysis,which can be used to evaluate and predict the stability of the tun-nel surrounding rock,and give guidance to construction.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
During the tunnel construction,Monitoring measurement is one of the three elements of New Austrian Method Construction for Tunnel.Data are obtained by observing and measuring the settlement of Dongnong Tunnel Vault and periphery displacement of Yungui Railway.The mathematical model is established by means of regression analysis,which can be used to evaluate and predict the stability of the tun-nel surrounding rock,and give guidance to construction.
Key concepts: Settlement (finance), Tunnel construction, Displacement (psychology), Section (typography), Stability (learning theory), Geotechnical engineering, Engineering, Railway tunnel