2010•Journal of Nantong Vocational CollegeRequires access

Monitoring and Results Analysis of One Large Tunnel Engineering

Shi Bao Dong

Open publisher page 0 citations

Abstract

Based on one large tunnel engineering in Chongqing,vault settlement,the surrounding rock displacement convergence,rock pressure and axial force of steel have been monitored,which results have been dynamic analysis.The surrounding rock pressure and displacement as function of time is calculated.The test results were quantitatively analyzed,in order to get the period changes of the tunnel monitoring.At the same time,a qualitative evaluation has been done with the tunnel results of monitoring on the design and construction.With which proposals in future have been focused on the design and construction of similar projects.

About this research paper

What this paper is about

Based on one large tunnel engineering in Chongqing,vault settlement,the surrounding rock displacement convergence,rock pressure and axial force of steel have been monitored,which results have been dynamic analysis.The surrounding rock pressure and displacement as function of time is calculated.The test results were quantitatively analyzed,in order to get the period changes of the tunnel monitoring.At the same time,a qualitative evaluation has been done with the tunnel results of monitoring on the design and construction.With which proposals in future have been focused on the design and construction of similar projects.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Based on one large tunnel engineering in Chongqing,vault settlement,the surrounding rock displacement convergence,rock pressure and axial force of steel have been monitored,which results have been dynamic analysis.The surrounding rock pressure and displacement as function of time is calculated.The test results were quantitatively analyzed,in order to get the period changes of the tunnel monitoring.At the same time,a qualitative evaluation has been done with the tunnel results of monitoring on the design and construction.With which proposals in future have been focused on the design and construction of similar projects.

Key concepts: Displacement (psychology), Settlement (finance), Geotechnical engineering, Tunnel construction, Engineering, Vault (architecture), Qualitative analysis, Convergence (economics)

Related papers

Back to paper searchBrowse research topicsOriginal source
Monitoring and Results Analysis of One Large Tunnel Engineering — Research Paper | ScholarLens