Monitoring and Results Analysis of One Large Tunnel Engineering
Shi Bao Dong
Abstract
Shi Bao Dong
Abstract
Based on one large tunnel engineering in Chongqing,vault settlement,the surrounding rock displacement convergence,rock pressure and axial force of steel have been monitored,which results have been dynamic analysis.The surrounding rock pressure and displacement as function of time is calculated.The test results were quantitatively analyzed,in order to get the period changes of the tunnel monitoring.At the same time,a qualitative evaluation has been done with the tunnel results of monitoring on the design and construction.With which proposals in future have been focused on the design and construction of similar projects.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Based on one large tunnel engineering in Chongqing,vault settlement,the surrounding rock displacement convergence,rock pressure and axial force of steel have been monitored,which results have been dynamic analysis.The surrounding rock pressure and displacement as function of time is calculated.The test results were quantitatively analyzed,in order to get the period changes of the tunnel monitoring.At the same time,a qualitative evaluation has been done with the tunnel results of monitoring on the design and construction.With which proposals in future have been focused on the design and construction of similar projects.
Key concepts: Displacement (psychology), Settlement (finance), Geotechnical engineering, Tunnel construction, Engineering, Vault (architecture), Qualitative analysis, Convergence (economics)