Analysis of Displacement Monitoring Measurement in Tunnel Construction
Yang Liu, Jie Hu
Abstract
Yang Liu, Jie Hu
Abstract
Based on measured data of Wuxinzhai tunnel in expressway of Shanyin to Pinglu, mathematical methods were used to make regressing analysis of measured date on crown settlement and periphery convergence. According to the time-effect of soil mass excavation in New Austrian Tunneling Method, the relations between rock deformation and time during the tunnel construction was analyzed. The results of analysis could provide an theoretical basis for modifying design and construction , and also could offer an example for similar projects in this area.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Based on measured data of Wuxinzhai tunnel in expressway of Shanyin to Pinglu, mathematical methods were used to make regressing analysis of measured date on crown settlement and periphery convergence. According to the time-effect of soil mass excavation in New Austrian Tunneling Method, the relations between rock deformation and time during the tunnel construction was analyzed. The results of analysis could provide an theoretical basis for modifying design and construction , and also could offer an example for similar projects in this area.
Key concepts: Settlement (finance), Displacement (psychology), Tunnel construction, Excavation, Rock mass classification, Geotechnical engineering, Quantum tunnelling, Deformation (meteorology)