2014•Mining and Metallurgical EngineeringRequires access

Analysis of Surrounding Rock Stability Based on Monitoring and Measurement of Guanhuchong Tunnel

WU Ji-mi

Open publisher page 0 citations

Abstract

In order to evaluate the stability of surrounding rock in Guanhuchong Tunnel during construction,the monitoring data and measurement about peripheral displacement convergence,vault settlement and uplift of inverted arch were put together for analysis. It is shown that the peripheral displacement convergence and vault settlement change faster in the early stage of construction,then slow down at the later half stage of construction,resulting in the surrounding rock in a mostly stable condition. This analytical method may be of reference for future reasonable usage of monitoring and measurement data of similar tunnels.

About this research paper

What this paper is about

In order to evaluate the stability of surrounding rock in Guanhuchong Tunnel during construction,the monitoring data and measurement about peripheral displacement convergence,vault settlement and uplift of inverted arch were put together for analysis. It is shown that the peripheral displacement convergence and vault settlement change faster in the early stage of construction,then slow down at the later half stage of construction,resulting in the surrounding rock in a mostly stable condition. This analytical method may be of reference for future reasonable usage of monitoring and measurement data of similar tunnels.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to evaluate the stability of surrounding rock in Guanhuchong Tunnel during construction,the monitoring data and measurement about peripheral displacement convergence,vault settlement and uplift of inverted arch were put together for analysis. It is shown that the peripheral displacement convergence and vault settlement change faster in the early stage of construction,then slow down at the later half stage of construction,resulting in the surrounding rock in a mostly stable condition. This analytical method may be of reference for future reasonable usage of monitoring and measurement data of similar tunnels.

Key concepts: Settlement (finance), Arch, Displacement (psychology), Geology, Geotechnical engineering, Vault (architecture), Stability (learning theory), Convergence (economics)

Related papers

Back to paper searchBrowse research topicsOriginal source
Analysis of Surrounding Rock Stability Based on Monitoring and Measurement of Guanhuchong Tunnel — Research Paper | ScholarLens