Main arch construction control of the half-through steel pipe concrete arch bridge
Jia Zhang
Abstract
Jia Zhang
Abstract
Combining with concrete project,it introduces the overall setting of the bridge,analyzes the necessity of the main arch construction control of the half-through steel pipe concrete arch bridge,and describes the construction control principle and measure,so as to make the forcing and deformation of the whole bridge construction process in ideal state.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Combining with concrete project,it introduces the overall setting of the bridge,analyzes the necessity of the main arch construction control of the half-through steel pipe concrete arch bridge,and describes the construction control principle and measure,so as to make the forcing and deformation of the whole bridge construction process in ideal state.
Key concepts: Arch, Bridge (graph theory), Arch bridge, Structural engineering, Engineering, Deformation (meteorology), Forensic engineering, Civil engineering