Wuhan-Guangzhou passenger special line is the most important backbone of China high speed railway net. The line span is 968 km, among of them; roadbed is 388 km, occupied 40.1% of the total line. Due to the rigorous residual settlement of the roadbed, the CFG (Cement Flayash Gravel) pile is used as the composite foundation to enforce the intensity of roadbed and reduce the post-settlement. The paper studies on CFG pile composite foundation at the Wuhan experimental section, using the finite element numerical simulate the interaction of the pile and pile surrounding soil under the permanent load conditions. The results show that the stimulation model has the more accordance with the actual observation results. The residual settlement comes from the soil layer is bigger than the pile length.

About this research paper

What this paper is about

Wuhan-Guangzhou passenger special line is the most important backbone of China high speed railway net. The line span is 968 km, among of them; roadbed is 388 km, occupied 40.1% of the total line. Due to the rigorous residual settlement of the roadbed, the CFG (Cement Flayash Gravel) pile is used as the composite foundation to enforce the intensity of roadbed and reduce the post-settlement. The paper studies on CFG pile composite foundation at the Wuhan experimental section, using the finite element numerical simulate the interaction of the pile and pile surrounding soil under the permanent load conditions. The results show that the stimulation model has the more accordance with the actual observation results. The residual settlement comes from the soil layer is bigger than the pile length.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Wuhan-Guangzhou passenger special line is the most important backbone of China high speed railway net. The line span is 968 km, among of them; roadbed is 388 km, occupied 40.1% of the total line. Due to the rigorous residual settlement of the roadbed, the CFG (Cement Flayash Gravel) pile is used as the composite foundation to enforce the intensity of roadbed and reduce the post-settlement. The paper studies on CFG pile composite foundation at the Wuhan experimental section, using the finite element numerical simulate the interaction of the pile and pile surrounding soil under the permanent load conditions. The results show that the stimulation model has the more accordance with the actual observation results. The residual settlement comes from the soil layer is bigger than the pile length.

Key concepts: Pile, Settlement (finance), Foundation (evidence), Geotechnical engineering, Residual, Engineering, Composite number, Span (engineering)