Comparison and Analysis Settlement of Driven Pile and Cast-in-place Pile of High-rise Building
Niu Zi-chun
Abstract
Niu Zi-chun
Abstract
Based on long-term settlement monitoring data of driven pile and cast-in-place pile of large quantity of high-rise buildings in Shanghai, the comparison of construction period settlement and finally monitoring settlement for driven pile and cast-in-place pile were analyzed.The results show the long-term settlement behavior of cast-in-place pile is better than that of driven pile.Finally the mechanism of them was discussed.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Based on long-term settlement monitoring data of driven pile and cast-in-place pile of large quantity of high-rise buildings in Shanghai, the comparison of construction period settlement and finally monitoring settlement for driven pile and cast-in-place pile were analyzed.The results show the long-term settlement behavior of cast-in-place pile is better than that of driven pile.Finally the mechanism of them was discussed.
Key concepts: Pile, Settlement (finance), Engineering, Geotechnical engineering, High rise, Structural engineering, Computer science, World Wide Web